If you would like further information about how we can assist with your site requirements, please contact us.

ARCHIS CUBE FAVICON
Case Study

Axion House, Lewisham - Full Scaffold & Hoist Access

Overview

 

Archis Scaffolding was appointed to provide the full scaffolding and vertical access package for the construction of three new-build residential blocks at Axion House, Lewisham. Each block features a unique design and height profile, requiring tailored scaffold planning to suit individual build sequences and façade configurations.

 

The works involve a high volume of progressive scaffold installation across the site, delivered in line with a fast-paced construction programme and complex architectural elements.

 

Scope of Work

Special Design Considerations

 

Due to the architectural complexity of the site, a number of elevations presented challenges for scaffold support. One block included a fully cantilevered section above Level 1, which required bespoke structural design input. Our engineering partners provided detailed designs to enable safe, load-bearing scaffold solutions that aligned with the building form while maintaining stability and safe working conditions.

 

The entire scaffold system was built in a phased approach, adjusted floor by floor to suit the sequencing of brickwork and cladding. This ensured minimal disruption to trades and optimised material movement across the site using the suspended loading bays.

 

Challenges Overcome

Case Study

Details of Project

  • Project Name: Axion House
  • Location: Lewisham, London
  • Requirements: Full scaffold and hoist access package for three new-build residential blocks, including cantilevered loading bays, stair access, and phased scaffold installation with sheeting.
  • Status: In Progress
ARCHIS CUBE FAVICON
CONTACT US

How Can We Help?

Any questions, enquires or just a quick hello? – please contact us today.

HEAD OFFICE

Archis Scaffolding Ltd

1 Kings Avenue

London

N21 3NA